Industry · Department 08

BIM Technology

BIM as its own technology: multi-discipline authoring, railway and transit models, clash-free coordination, 4D/5D time-cost, ISO 19650 common data environment, constructible structure, and as-built handover into the twin. Specified for CPWD, NHAI, Indian Railways station redevelopment, metro and RRTS EIRs.

7 lines across 7 sub-systems

Model Authoring

Architecture, structure, and MEP in one parametric model.

ProductOpen
Multi-discipline BIM Authoring

One parametric model for architecture, structure, and MEP — drawings, schedules, and quantities from the same source.

View

Railway & Transit BIM

Track, OLE, station, and signalling corridors.

ProductOpen
Railway & Transit BIM

Corridor, track, OLE, station, and signalling in one information model — for IR, metro, and RRTS.

View

Clash & Coordination

Federated models. Hard and soft clash. Close-out reports.

ProductOpen
Clash Detection & Federated Coordination

Federate every trade into one model. Find the clash in the hut, not on the possession.

View

4D / 5D Planning

Programme and bill on the same objects.

ProductOpen
4D / 5D Time-Cost BIM

The model linked to the programme and the bill — time as the fourth dimension, cost as the fifth.

View

Common Data Environment

ISO 19650 CDE, BEP, and LOD packs for Indian public clients.

ProductOpen
ISO 19650 Common Data Environment

The single source of truth for BIM tenders — BEP, containers, status, and LOD packs for CPWD, NHAI, IR, and metro.

View

Constructible Structure

Steel and RC the shop can cut.

ProductOpen
Constructible Structural BIM

Steel and reinforced-concrete models that a shop can cut, bend, and erect — not a design sketch.

View

Twin Handover

As-built information model into the live twin.

ProductOpen
BIM-to-Twin Handover

The as-built information model becomes the digital twin the operator actually runs.

View