
BIM Technology · Twin Handover
BIM-to-Twin Handover
The as-built information model becomes the digital twin the operator actually runs.
Specification
N-HANDOVER is the last mile of BIM: classified, COBie-style, and asset-tagged objects passed from the construction CDE into the live twin — the same twin the AR crew and the possession briefing already use. CPWD and metro facilities clauses increasingly ask for a model that survives handover. This is that product, sitting next to Plant Twin and the XR estate.
Capabilities
- As-built model validation against the EIR
- Asset classification and COBie-style data drop
- Handover into Plant Twin / XR rooms
- FM attributes: warranty, spare, maintain-on
- Keeps geometry and data in one living model
Applications
- Station FM
- Depot operations
- Smart campuses
- Process plants
- Airport terminals
Related lines
| Product | Open | |||
|---|---|---|---|---|
| NBIM | Multi-discipline BIM Authoring One parametric model for architecture, structure, and MEP — drawings, schedules, and quantities from the same source. | Station buildings | Disciplines: Architecture / structure / MEP | View |
| RT-BIM | Railway & Transit BIM Corridor, track, OLE, station, and signalling in one information model — for IR, metro, and RRTS. | IR station redevelopment | Scope: Track / OLE / station / signalling | View |
| N-CLASH | Clash Detection & Federated Coordination Federate every trade into one model. Find the clash in the hut, not on the possession. | Metro stations | Checks: Hard / soft / clearance | View |
| N-45 | 4D / 5D Time-Cost BIM The model linked to the programme and the bill — time as the fourth dimension, cost as the fifth. | EPC programmes | 4D: Programme / WBS linked to objects | View |
Brief this article
Site, quantity, and the specification you are buying against. Presales replies from presales@navtronics.in.