
BIM Technology · Constructible Structure
Constructible Structural BIM
Steel and reinforced-concrete models that a shop can cut, bend, and erect — not a design sketch.
Specification
N-FAB takes the structural model to fabrication: connections, rebar, embeds, shop drawings, and CNC-ready data. Used on station roofs, depot shops, flyovers, and industrial halls where the fabricator and the site must share one constructible model. LOD 400 is a deliverable, not a slide.
Capabilities
- Steel detailing, connections, and numbering
- Rebar, embeds, and RC shop drawings
- Fabrication and CNC exports
- Erection sequences tied to 4D
- Round-trip with the federated coordination model
Applications
- Station roofs and concourses
- Depot structures
- Flyovers and ROB/RUB
- Industrial halls
- Garrison works
Related lines
| Product | Open | |||
|---|---|---|---|---|
| NBIM | Multi-discipline BIM Authoring One parametric model for architecture, structure, and MEP — drawings, schedules, and quantities from the same source. | Station buildings | Disciplines: Architecture / structure / MEP | View |
| RT-BIM | Railway & Transit BIM Corridor, track, OLE, station, and signalling in one information model — for IR, metro, and RRTS. | IR station redevelopment | Scope: Track / OLE / station / signalling | View |
| N-CLASH | Clash Detection & Federated Coordination Federate every trade into one model. Find the clash in the hut, not on the possession. | Metro stations | Checks: Hard / soft / clearance | View |
| N-45 | 4D / 5D Time-Cost BIM The model linked to the programme and the bill — time as the fourth dimension, cost as the fifth. | EPC programmes | 4D: Programme / WBS linked to objects | View |
Brief this article
Site, quantity, and the specification you are buying against. Presales replies from presales@navtronics.in.